DStv Channel 403 Monday, 18 November 2024

Restore the power grid | Boiler tube leaks blamed for blackouts

JOHANNESBURG - Eskom says Stage 5 blackouts will remain in force until further notice.

This after about 10 units were taken out of service due to boiler tube leaks.

READ: Restore the power grid | South Africans frustrated with power cuts

Everisto Benyera from the University of South Africa believes the problem at Eskom is political.

He discusses this further.

Boiler tube leaks blamed for blackouts Part 2
Boiler tube leaks blamed for blackouts Part 3
Boiler tube leaks blamed for blackouts Part 4
Boiler tube leaks blamed for blackouts Part 5

Paid Content